Chaitén Sewage Plant construction

Sewage Plant construction

Essal

Chaitén, X, 2013

Investment amount: 1.625.000 USD

  • Design and Construction of a sewage treatment plant for the City of Chaitén. The design flow considered was 6.6 l/s for the year 2025, considering the stages of Pretreatment, Biological Treatment (reactors, settlers, sludge treatment), Effluent Disinfection and final discharge.
  • Supply and assembly of Huber Ro5-ADV pretreatment equipment, aeration grills with 144 SSI diffusers, 3 KAESER model C131 blowers, sludge sweeper bridge, chlorine dosing pumps, sludge liming system, Westfalia sludge centrifuge, preparation system of Prominent polymers, Sodimate liming system, flow and control sensors, agitators.
  • Execution of Hydraulic, Instrumentation and Control project.